Get Quote

Cangzhou Zhongshun Steel Pipe Trade Co., Ltd.

How to put our steel tube into the container

2017 12/18

First ,bundle with steel strip,then put them into container by forklift.

Shipment detail:

a. pipe length:≤5.8m loaded in 20FT Container with 25-27tons

b.pipe length:≤11.8m loaded in 40FT Container with 25-27tons

Trade Terms: FOB / CIF / CFR

Payment Terms: LC TT

Loading Port: Xingang Tianjin,China

Delivery: 7-15 weeks after received deposit

Name: July

CangZhou ZhongShun Steel Pipe Trade CO., LTD

mobile/whatsapp: +86-15076763716

Email: july@zssteeltube.com

Browse by: All Products | China Suppliers Service is provided by Bossgoo.com

Copyright © 2008-2024 Bossgoo Co., Ltd. All rights reserved.

Your use of this website constitutes acknowledgement and acceptance of our Terms & Conditions